ReleaseNotes

4 Top Release Notes Examples for Beginners

What Slack, Apple, monday.com, and Samsung still get right in their public release notes, and how a small team can copy the same habits.

SStephen Nevilleon · Updated
4 Top Release Notes Examples for Beginners

Release notes tell people what changed, why it matters to them, and whether they need to do anything. The teams who do this well are not writing longer notes. They are making four habits obvious: be specific, write for the reader, show the change, and give the page a structure someone can scan.

The four pages below are public, and each one is worth opening before you write your next update. Use them as patterns, then look at how to write release notes when you want the full checklist.

1. Slack: say what changed, and when it is fine to say “not much”

Slack’s Windows release notes are still a useful beginner reference because every entry has the same bones:

  • A version number
  • A date
  • A short category, such as bug fixes or security guidance
  • A few sentences on what the reader should know

When a build is a security update, Slack says so and tells people that updating is recommended. When a build has no user-facing change, the note says that too, instead of inventing a feature list. That is the habit to copy. Readers trust a short, honest note more than a paragraph that hides the point.

A beginner version of the same shape:

### 2.4.1 — 3 November 2026

**Security**
This release includes security improvements. Update when you can.

**Fixed**
Sharing a dashboard no longer emails people who were removed from the project.

Notice what is missing: the ticket number, the library you upgraded, and a tour of the internal refactor. Those belong in the engineering changelog. The release note is the part a customer can act on. The difference is covered in changelog vs. release notes.

2. Apple: start from what the person can now do

Apple’s update pages, such as About iOS updates, are written as a change in the reader’s day. The first lines describe what the update makes possible, in plain language, and later sections point to help for the details.

You do not need Apple’s design team to copy the stance:

  • Lead with the outcome, not the component name.
  • Assume the reader was not in the sprint review.
  • Link to a deeper article when the change needs steps, instead of pasting the whole manual into the note.
  • Skip acronyms unless you have just explained them.

A feature note written that way sounds like this:

You can now turn on email subscriptions from your changelog. Visitors subscribe themselves, and you send the announcement when the note is ready. Publishing the release does not send the email.

That is more useful than “Added subscriber endpoint and broadcast job.”

3. monday.com: make the update scannable

monday.com’s What’s New page is a product-updates hub: a short overview, release highlights, and a filterable list of changes across web, desktop, and mobile. The lesson is not “add more decoration.” It is that a person should be able to see, in a few seconds, whether this month’s changes affect them.

Borrow these choices even if your page is a single post:

  • Group updates (new, improved, fixed) instead of one chronological blob.
  • Put the most visible change first, and give it a screenshot or a short clip.
  • Keep the rest of the month as short items so the page still feels light.
  • Let the company’s voice show up in the headline, then get out of the way in the body.

Screenshots earn their place when they show the control that moved or the screen that is new. A full-window marketing render of the whole product usually does not.

4. Samsung: give the note a stable structure

Samsung’s browser release notes are the formal end of this set. The page is split into sections a returning reader can predict: change history, known issues, and features, with separate notes for different products.

Most SaaS teams do not need a table of platform builds. They do need a structure that does not change every month. Pick one and keep it:

  1. Title and date
  2. One-sentence summary
  3. New and improved
  4. Fixed
  5. Action required, or an explicit “no action required”
  6. Known issues, if any

Headings, bullets, and the occasional table do the work. A dropdown of older versions is worth adding once the history is long enough that the latest note should stay at the top.

What to leave out while you are learning

  • A list of every commit. Group them into outcomes.
  • Internal names (“Project Falcon”, “the v2 parser”) unless customers use those names.
  • An apology paragraph that is longer than the fix.
  • A note that is only visible after someone logs in, unless the change itself is private. Prospective customers read release notes too.

Draft the first note in that shape

You can write the note by hand, and many teams still do. If the raw material is already in pull requests, closed issues, or the sprint board, an agent can assemble the first draft.

ReleaseNotes gives Claude, ChatGPT, Cursor, and other compatible agents an MCP connection to your projects, releases, and recent activity. On Teams and Business you can also draw on Jira, GitHub, Azure DevOps, and the API. Ask the agent for a customer note in the Slack shape above: version or date, a category, and what the reader should do. It saves a draft in your voice for review. You edit it, add the screenshot, and publish.

The same published note can go to the hosted changelog, an in-app popup, unread badge, or banner, and a Slack channel. Email is a separate send, so you can preview it before subscribers receive it. Private notes, for customers or internal stakeholders only, are on the Business plan. Plans and limits are on the pricing page.

Open one of the four examples, write a single update in that shape, and publish it. The second note is easier because the structure is already decided.